{"id":32025,"date":"2022-10-05T08:50:05","date_gmt":"2022-10-05T08:50:05","guid":{"rendered":"https:\/\/www.gsolarsteel.com\/gonvarri-solar-steel-e-iberdrola-firman-un-nuevo-acuerdo-de-mas-de-12-gw-en-espana-y-portugal\/"},"modified":"2025-05-21T07:38:37","modified_gmt":"2025-05-21T07:38:37","slug":"gonvarri-solar-steel-e-iberdrola-firman-un-nuevo-acuerdo-de-mas-de-12-gw-en-espana-y-portugal","status":"publish","type":"post","link":"https:\/\/www.gsolarsteel.com\/es\/gonvarri-solar-steel-e-iberdrola-firman-un-nuevo-acuerdo-de-mas-de-12-gw-en-espana-y-portugal\/","title":{"rendered":"Gonvarri Solar Steel e Iberdrola firman un nuevo acuerdo de m\u00e1s de 1,2 GW en Espa\u00f1a y Portugal"},"content":{"rendered":"<p>Solar Steel ha firmado con Iberdrola el suministro de 289MW en seguidores solares TracSmarT+1V (monofila y bifila) as\u00ed\u00ad como 938MW de estructura fija RackSmarT totalizando 1,227 GW.<\/p>\n<p>Los proyectos localizados en Espa\u00f1a son Ciudad Rodrigo (324,5MW), Cedillo II (375 MW), Bas\u00ed\u00adlicas (99,9 MW), Salinas I, II, II (148,4MW), Majal Alto (50,5 MW), Pe\u00f1arrubia (50 MW),Tallisca (48 MW), Ballestas (41 MW) y Casetona (28,6 MW).<\/p>\n<p>Carregado (61,6MW) es el proyecto localizado en Portugal y ser\u00e1 una planta que cuente con parte de instalaci\u00f3n fija y tracker. Gonvarri Solar Steel e Iberdrola afianzan a\u00fan m\u00e1s su compromiso hacia un mundo m\u00e1s sostenible y libre de emisiones.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Solar Steel ha firmado con Iberdrola el suministro de 289MW en seguidores solares TracSmarT+1V (monofila y bifila) as\u00ed\u00ad como 938MW de estructura fija RackSmarT totalizando 1,227 GW. Los proyectos localizados en Espa\u00f1a son Ciudad Rodrigo (324,5MW), Cedillo II (375 MW), Bas\u00ed\u00adlicas (99,9 MW), Salinas I, II, II (148,4MW), Majal Alto (50,5 MW), Pe\u00f1arrubia (50 MW),Tallisca [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":32604,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"rank_math_lock_modified_date":false,"footnotes":""},"categories":[48],"tags":[],"class_list":["post-32025","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-notas-de-prensa"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.gsolarsteel.com\/es\/wp-json\/wp\/v2\/posts\/32025"}],"collection":[{"href":"https:\/\/www.gsolarsteel.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.gsolarsteel.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.gsolarsteel.com\/es\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.gsolarsteel.com\/es\/wp-json\/wp\/v2\/comments?post=32025"}],"version-history":[{"count":1,"href":"https:\/\/www.gsolarsteel.com\/es\/wp-json\/wp\/v2\/posts\/32025\/revisions"}],"predecessor-version":[{"id":35187,"href":"https:\/\/www.gsolarsteel.com\/es\/wp-json\/wp\/v2\/posts\/32025\/revisions\/35187"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.gsolarsteel.com\/es\/wp-json\/wp\/v2\/media\/32604"}],"wp:attachment":[{"href":"https:\/\/www.gsolarsteel.com\/es\/wp-json\/wp\/v2\/media?parent=32025"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.gsolarsteel.com\/es\/wp-json\/wp\/v2\/categories?post=32025"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.gsolarsteel.com\/es\/wp-json\/wp\/v2\/tags?post=32025"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}